The Worklist
There's much to be done before the boat is race ready. Most of these
items are underway and many have been completed. Here's a mostly
complete list:
- New Baltoplate bottom
(DONE...FINALLY!)
- Minor blister repair
(done)
- Remove and rebed through-hulls and insulate from core with solid glass
(done)
- Remove and reinstall prop (it’s loose)
(done)
- Have Martec recondition prop?
(not necessary)
- New head (plumbing looks OK, just swapping the head)
(done)
- Either fix existing instruments or replace, nothing too fancy
(depth/speed OK; wind to be rebuilt)
- All new running rigging
(Done)
- Replace sheaves as necessary
(Done,
click here for details
)
- Check turning blocks at base of mast, replace if necessary
(not necessary)
- Replace original Antal “line stoppers” with Spinlock clutches. I had to beat the Antals open with a winch
handle when they were under load
(Done)
- Careful inspection of standing rigging by professional rigger.
(Done - OK)
- New Tuff Luff Aero headstay foil
(Done)
- New fixed mount GPS
(Done)
- New fixed mount VHF
(Done)
- New stereo, inside speakers only
(Done)
- Replace Lexan on forward hatch
(Done)
-
Lewmar One Touch winch handles
(Done)
-
Spinlock Asymmetric Tiller Extension
(Done)
-
Harken windward sheeting traveler car
(This will wait until next year)
-
Rigid Boom vang
(Done)
-
Engine tune up: hoses, clamps, filters, zincs and fluids
(Done)
-
Properly installed battery maintainer
(Done)
-
Shore power
(not a priority, won't happen anytime soon - if at all)
-
Electrical connections: check, clean and upgrade as needed (
underway
)
- Find out why aft bilge area is not draining forward to where the bilge pump is
(done)
-
Clean stuffing box area and monitor for drip rate
(Done)
-
Replace stern light
(not necessary)
-
Replace bulbs on all navigation lights
(Done)
-
Purchase MOB pole (required for race)
(Done)
-
Install lower lifeline at gate (gate is on stbd. and there is no lower lifeline right where crew will be hiking)
- Polish and wax topsides (heavily oxidized)
(Done)
-
Repair minor gelcoat dings and try to color match
- Remove all traces of former name
(Done)
-
Order and apply “Rambunctious” vinyl graphic on both quarters
(Done)
-
Rebed chainplates
(Done)
-
Rebed stanchions and pulpits
- Varnish exterior wood
(will wait until it cools off - too hot for varnish!)
- Purchase Coast Guard required safety equipment
(Done)
- Lots of incidentals plus a couple of big items that I can’t remember or haven’t discovered yet